Acnl Marble Bathtub How to Make
1. Technological process to clean the surface of the structure → pop up the vertical line on the structure → hang two vertical steel wires at the big angle, receive the goods at the construction site → punch the stone material → brush the glue on the back → paste the flexible reinforcing material, hang the horizontal position line → support the bottom plate Bracket→Place the bottom plate→Adjustment and temporary fix→Fill M20 cement→Set up drainage pipe→Drill holes and insert fixing bolts→Insert stainless steel fixings→Fill the holes on the lower wall with adhesive→Insert connecting steel pins→Fill the adhesive Enter the lower hole of the upper wall panel to temporarily fix the upper wall panel → drill holes and insert expansion bolts → install stainless steel fixings → install the top wall panel
2. Receiving the goods at the construction site: a special person is responsible for finding quality problems and handling them in time, and is responsible for the stacking of stones on site.
3. Stone preparation: Use colorimetry to select and classify the color of the stone. The color of the stone installed on the same side should be the same, and the stone should be numbered according to the design drawings and the order of blocks.
4. Grass-roots preparation: clean up the structural surface of the prefabricated veneer stone, and at the same time carry out structural formulas, rules, and pop-up vertical and horizontal lines. And pop up the location line and block line of the installation stone according to the design drawings and actual needs.
5. Hanging line: according to the design drawing